Annual Development Program (RADP) 2016-2017

GoB Funded Projects

Sl. No. Name of the Project ADP allocation (in Lac Taka)
1. Estabishment of National HRD Centre of DPHE 439.00 
2. 37 Towns Water Supply Project 10000.00 
3. Water Supply and Sanitation Project in Tongi Pourasava 3555.00
4. Water supply and environmental sanitation project at thana sadar and growth centre pourasava 5000.00
5. 40 Pourasava and Growth Centre Water Supply and Environmental Sanitation Project (Phoase-2) 3000.00 

6.

Village Water Supply Project 13094.00

7.

National Sanitation Project (3rd Phase)  2100.00 

8.

Water Preservation and Safe Water Supply Project through Re-excavation/ Maintenance of Ponds/Dighi/Ditches Owned by Zila Parishads 1000.00
9. Feasibility Study and Development Project Preparation for Water Supply Facilities for Cox's Bazar Town 50.00
10. The Project for Safe Water Supply at Different Upazila of Bandarban District 68.00
 
Developed By Systech Digital Ltd.